Work Bond
Current Needs

Updated 5/25/2008
 
Paint remaining vertical posts on Silhouette range with primer and then all of the posts with doeskin paint
 
Put up wood trim on west Silhouette range toilet around newly installed door.  prime and paint the door and trim.
 
Reshingle the storage shed on the Silhouette range
 
Paint the west side of the Schutzen range firing line roof.
 
Install soffit board on HP 1000 yd outhouse.  Prime and paint as required
 
Scrape and prime the north end metal door of the 300 yd line toilet on the HP range
 
Replace firing line markers as required on HP range.
 
Mowing season has started.  Mow as required
 
Water Camper pad trees
 
Volunteer to help at the Aug. 21-24 State Silhouette Pistol Match